Skip to main content
The Spondumene Rock

Extracting more value out of Australia's lithium resources with new process

The Challenge

As global demand for lithium accelerates with the growth of electric vehicles and grid-scale energy storage, producers face a critical bottleneck: conventional hard-rock lithium processing leaves significant quantities of lithium unrecovered. Traditional refining of spodumene, the source mineral, depends on an energy-intensive thermal conversion step, in which ore is heated to around 1,000° c before acid leaching. This process works best only for higher-grade material and coarser particles. Fine spodumene concentrates and low-quality ores are often rejected to mine tailings, that results in substantial lithium losses-in some operations. As much as 30-50% of mined lithium units may not enter the supply chain.

The Solution

The LieNA® process introduces a fundamentally different extraction pathway for the processing of hard-rock lithium resources. Instead of relying on high-temperature roasting (>1,000° C), the process uses a hydrothermal caustic digestion method conducted in an autoclave at much lower temperatures (<300° C). By enabling the conversion to occur in solution, fine mineral material may be processed that would otherwise be blown out of a furnace. The lower conversion temperature significantly reduces energy intensity and processing costs to allow the treatment of material previously considered waste.

ANSTO's Minerals team has been developing the LieNA® process in collaboration with Livi um Ltd (ASX:LIT) since 2015, that culminated in two pilot plant campaigns run over 25 days in 2024. The pilot plants converted spodumene to lithium phosphate, a mineral needed for lithium iron phosphate (LFP) cathode production, and demonstrated the performance of the technology under continuous, steady-state conditions at scale.

A photo taken of final adjustments being made to the LieNA® piloting autoclave
Final adjustments being made to the LieNA® piloting autoclave

The Impact

The successful execution of this work was a key milestone towards commercialisation of the LieNA® process. It was crucial to the establishment of a 50:50 joint venture between Livium and WA lithium miner Min Res in August 2025, which was formed to further develop this technology.

ANSTO continues to support this process and has recently refined the pilot plant to produce lithium phosphate to an ultra high purity battery specification and validated the performance of the technology with other low grade mineral concentrates.

 

Australian Research Priority or Futures Made in Australia Framework

  • Building a secure and resilient nation Critical and strategic minerals 

ANSTO strategic priority

  • Deliver on Australia's priorities for the benefit of people, industry and the environment 

Collaborators/clients

  • Livium Ltd

ANSTO contributors

  • Dr Chris Griffith
    Adrian Manis
    Maritza Valencia Bejerano

Contact
Chris Griffith
cgz@ansto.gov.au